Advantages- Flexible and crack-bridging
- Excellent waterproofing properties
- Strong adhesion to concrete and coatings
- Low VOC, 100% solids
- Easy application with roller or trowel
- Suitable as topcoat over epoxy systems
Technical DataParameterProperty | Value |
Packaging | 11.35 L (3 US gal), 56.7 L (15 US gal) |
Color | Part A: Upon Request; Part B: Clear to Amber |
Mixed Color | Upon Request |
Mix Ratio (by volume) | A:B = 2:1 (100:50) |
Mix Ratio (by weight) | Clear: A:B = 100:44 / Colors: A:B = 100:43 |
Gel Time (454g @ 25°C) | 20–30 minutes |
Solids Content | 100% (by weight and volume) |
VOC (g/L) | A: 37.6 / B: 173.1 / Mix: 78.9 |
Viscosity @ 25°C (cP) | A: 3500–4500 / B: 350–425 / Mix: 1500–1900 |
Specific Gravity | A: 1.14–1.16 / B: 0.9–1.0 |
Thinner Recommended | Xylene |
Shelf Life | 12 months (sealed, away from extremes) |
Performance Properties(@ 23°C / 73°F, 50% R.H.)Property | Value |
Tensile Strength | 2200–2400 psi |
Elongation | 70–75% |
Hardness (Shore D) | 35–45 |
Water Absorption | 0.3% |
Adhesion to Concrete | >300 psi (substrate rupture) |
Abrasion Resistance | 0.10 g loss (CS17, 1000g, 1000 cycles) |
Compressive Strength | Not Available |
Curing ScheduleTemperature | Foot Traffic | Light Traffic | Full Cure |
10°C (50°F) | 1 day | 3 days | 7 days |
20°C (68°F) | 16 hours | 2 days | 5 days |
30°C (86°F) | 12 hours | 24 hours | 5 days |
Recoating WindowTemperature | Minimum | Maximum |
10°C (50°F) | 8 hours | 24 hours |
20°C (68°F) | 6 hours | 24 hours |
30°C (86°F) | 6 hours | 24 hours |
Surface PreparationEnsure the substrate is clean, sound, and dry (<4% moisture). Surface must be prepared via shot blasting or mechanical grinding to achieve a profile equivalent to ICRI CSP 3–4. Substrate temperature should be at least 3°C above dew point.
Mixing InstructionsPrecondition all components to 15°C (59°F) minimum. Mix Part A and Part B at a 2:1 volume ratio for 3 minutes using a low-speed mixer. Scrape sides and bottom to ensure uniformity. Only mix as much as can be applied within pot life.
ApplicationApply with a roller, brush, or trowel. Ensure even thickness. If multiple coats are required, follow recoat window based on ambient temperature.
CleaningClean tools with xylene or a compatible cleaner before curing. Once cured, the product must be removed mechanically.
Restrictions- Application temperature: 15°C–30°C (59°F–86°F)
- Max ambient humidity: 85%
- Substrate moisture: <4%
- Avoid application on porous or moisture-transmitting substrates
- Protect surface from moisture and condensation for 24 hours post-application
- Product may discolor under UV exposure
Health & SafetyAvoid contact with skin and eyes. Use protective equipment such as gloves, safety glasses, and respirator. Work in a ventilated area. Refer to the SDS for detailed safety measures.